
SISS maintenance across the GWR network
Planned and corrective maintenance of CCTV, CIS, PA and Help Points at managed stations and depots, with a customer helpdesk, CCTV downloads and the asset database.
Projects
CCTV, CIS, Help Point, control room and enabling works projects for train operating companies.
Projects
2 records

Planned and corrective maintenance of CCTV, CIS, PA and Help Points at managed stations and depots, with a customer helpdesk, CCTV downloads and the asset database.

19 TDM two-button GSM Help Points supplied, installed, tested and commissioned across ten stations, wall and post mounted, with station handover packs.

Network-wide renewal of Help Points with TDM Standard GSM two-button units, from survey to handover, with TDM NIS configured and commissioned.
WAM-GSX Help Point board testing, fault assessment, repair and replacement, and spare boards for the EMR estate.

77 VoIP Help Points and their mounting posts supplied for a 19-station renewal, with enabling works, installation and commissioning.
Help Point maintenance support, WAM-GSX board testing and replacement, and Help Point spares.

Four existing Assistance Points upgraded with GSM replacement kits, and two new TDM two-button units for the Springbank Road and Fernbrook Road entrances.

A complete GSM Help Point conversion kit supplied, and the converted Help Point commissioned.

System integration for the GWR Security Operations Centre, providing LAN infrastructure, integrating a Barco video wall and CTRL platform, and upgrading the video management system.

Maintenance of Metro CCTV control and recording equipment, kept in service after the recorder manufacturer closed.
Replacement Help Points at 17 stations, including new low-voltage cable routes under and alongside the track at Great Coates and Swineshead.

4G and VoIP replacement kits, new enclosures, vinyl graphics, TDM NIS upgrade, phased accessibility repositioning and continuing Assistance Point maintenance across the network.

CCTV, customer information system displays and Help Points delivered as one installation under ES4 and ES5 design and Network Rail Landlord's Consent.

Public Address and customer information systems at five Island Line stations, connected by 4G and a Wi-Fi bridge in place of new cable routes.

ES5 telecoms design, then CCTV, CIS and PA supplied, installed, tested and commissioned for the remodelled ticket office and new access ramp.

CCTV, CIS and PA supplied, installed, tested and commissioned for the gateline works, with SISS design, acoustic modelling, network cabling and handover.

Customer information system displays at twenty stations on TDM-made brackets and columns, with a complete CIS and PA system at Parson Street.

CCTV for a three-platform station, installed above overhead line equipment and in the track bed under possessions and isolations.

CAT6 cabling at Exeter St David's, and temporary and permanent SISS works at Stroud and Slough, around station construction and refurbishment.