Contact

Case study

East Coast Help Point installation

19 TDM two-button GSM Help Points supplied, installed, tested and commissioned across ten stations, wall and post mounted, with station handover packs.

TDM two-button Help Point installed at an LNER station

TDM supplied, installed, tested and commissioned 19 TDM two-button GSM Help Points across 10 stations for LNER: Berwick-upon-Tweed, Darlington, Doncaster, Durham, Grantham, Newark Northgate, Newcastle, Peterborough, Retford and York.

The requirement

LNER needed one consistent Help Point package across the stations, with wall, post and mounting-plate arrangements that differed from station to station, and each station’s own access requirements.

What TDM delivered

  • 19 TDM two-button GSM Help Points with WAM-GSX electronics and Braille tactile panels, wall or post mounted, with 4G multiband antennas where the station design called for them.
  • Site surveys, design detail, mounting posts or plates where required, and the power and cabling works.
  • Testing and commissioning at each station, and a station handover pack for each.
  • Under a separate variation at Retford, replacement kits fitted in two existing Help Points on Platforms 3 and 4.

How the work was done

  • Access. TDM worked to the access processes of LNER at every station.
  • Station arrangements. Each Help Point went in to the approved arrangement for its station, recorded in that station’s handover documents.

Discuss a project like this one.