East Coast Help Point installation
19 TDM two-button GSM Help Points supplied, installed, tested and commissioned across ten stations, wall and post mounted, with station handover packs.
Installation and Commissioning
Station systems proven in the workshop, installed on the operational railway and brought into service.
Systems configured and proven in the Crawley workshop before site work.
Installation and CommissioningCivil, electrical, cabling, containment and equipment installation.
Installation and CommissioningSite testing, commissioning and Entry into Service.
Installation and CommissioningRequirement
Station systems have to be installed around a working railway, tested against the plan, and brought into service without disrupting passengers or operations.
TDM installs station systems from the foundations up: where a contract includes civil or electrical work, TDM delivers it within the same scope as the equipment, through to commissioning and Entry into Service.

Planning
TDM plans multi-station work as one programme, with stations sequenced by geography and changeovers phased so passenger information stays live. Where a principal contractor runs the wider programme, TDM’s work is fitted into it.
Each package of work has a Work Package Plan setting out the method, resources, access and handback. Where work runs on or near the line, access is arranged with Network Rail and a specialist track-access planner.
Preparation
Equipment is configured and proven in TDM’s Crawley workshop before it goes to site. In a CCTV programme, video management systems, recorders and network equipment were built and tested in the workshop, which reduced the work carried out on the operational railway.
Site installation
Site work covers the civil engineering, electrical installation, cabling, cabinets and site-specific mounting each station needs, on multi-station programmes and within contractors’ construction programmes, where temporary SISS keeps cameras working through the works.

Testing and handover
Installation is tested against the Inspection and Test Plan, commissioned, and brought into service. Handover includes operations and maintenance (O&M) documentation.
Scope
Projects

19 TDM two-button GSM Help Points supplied, installed, tested and commissioned across ten stations, wall and post mounted, with station handover packs.

System integration for the GWR Security Operations Centre, providing LAN infrastructure, integrating a Barco video wall and CTRL platform, and upgrading the video management system.

Network-wide renewal of Help Points with TDM Standard GSM two-button units, from survey to handover, with TDM NIS configured and commissioned.