Consents and Assurance

Network Rail consents, prepared and managed through.

Network Rail Landlord's Consent, listed building consent, design submissions and Entry into Service support for station works.

ES4 submissions, Landlord's Consent, listed building consent and Inspection and Test Plans.

Consents and Assurance

Requirement

Consents and an assurance route before Entry into Service

Work on the railway needs the right consents and an assurance route before it can enter service. Someone has to prepare the submissions and manage them through.

TDM prepares the submissions and manages them through. Final approval sits with Network Rail, the local planning authority or the relevant assurance body.

Consents and assurance routeTDM prepares ES4 design submissions for Approval in Principle, Landlord's Consent applications to Network Rail and, where a station is listed, listed building consent managed in parallel. Inspection and Test Plans are completed through installation and commissioning, and the Entry into Service documentation brings the system into operational use.Design acceptanceConsentsInstallationInto serviceES4 designSubmitted for Approval inPrincipleLandlord's ConsentNetwork Rail, with its conditionsListed building consentWhere the station is listedITPsInspection and TestPlansEntry into ServiceInto operational useManaged in parallelES4 designSubmitted for Approval in PrincipleLandlord's ConsentNetwork Rail, with its conditionsListed building consentWhere the station is listedITPsInspection and Test PlansEntry into ServiceInto operational use

What TDM prepares

Submissions from Approval in Principle to Entry into Service

  • Design acceptance. ES4 design submissions for Approval in Principle.
  • Landlord’s Consent. Applications to Network Rail for works on its property, including conditional consents and the conditions that follow.
  • Listed building consent. Where a station is listed, consent applications managed alongside the Network Rail process.
  • Track access. Safe Work Packs developed with Network Rail Asset Protection for cabling under and alongside the track, as on a multi-station Help Point replacement.
  • Inspection and Test Plans. ITPs completed through installation and commissioning.
  • Entry into Service. The documentation and evidence that brings the system into operational use.
Diagram of the design, consent and assurance documents TDM prepares for station works

Scope

Landlord's Consent, listed building consent and Entry into Service

  • ES4 designs for Approval in Principle
  • Network Rail Landlord's Consent applications
  • Listed building consent management
  • Inspection and Test Plans
  • O&M submissions
  • Entry into Service support
  • Network Rail engineering assurance for communications schemes

Projects

Consents and Assurance case studies

Discuss consents and assurance for a site.