Security Operations Centre video wall and integration
System integration for the GWR Security Operations Centre, providing LAN infrastructure, integrating a Barco video wall and CTRL platform, and upgrading the video management system.
Case study
CAT6 cabling at Exeter St David's, and temporary and permanent SISS works at Stroud and Slough, around station construction and refurbishment.

TDM delivered station systems works for Sisk Rail at Exeter St David’s, Stroud and Slough, each within a wider construction or refurbishment programme.
Each station needed a tightly defined intervention so the construction work could go ahead without losing its operational systems.
TDM sequenced each intervention around the programme of Sisk Rail and the operational constraints of the station.