Case study

Station systems works within construction programmes

CAT6 cabling at Exeter St David's, and temporary and permanent SISS works at Stroud and Slough, around station construction and refurbishment.

CCTV camera and cabling under a station canopy during refurbishment works

TDM delivered station systems works for Sisk Rail at Exeter St David’s, Stroud and Slough, each within a wider construction or refurbishment programme.

The requirement

Each station needed a tightly defined intervention so the construction work could go ahead without losing its operational systems.

What TDM delivered

  • Exeter St David’s. CAT6 cabling from the IT cabinet to new data points, terminated and qualified.
  • Stroud. Two CCTV cameras recovered and reinstated, with temporary and permanent SISS cabling to keep the Platform 2 equipment operational.
  • Slough. Temporary SISS works for the canopy refurbishment, including the temporary relocation of two CCTV cameras affected by scaffolding.

How the work was done

TDM sequenced each intervention around the programme of Sisk Rail and the operational constraints of the station.